All releases
ProjectsInstallsMarketplace
Your work history stays put, and projects stay open until the work is done
Archiving a project no longer hides it from the installers who did the work, projects can no longer flip to Completed around vehicles that are still open, and the network claim list only ever shows released vehicles.
Archiving no longer hides an installer’s work
Archiving tidies the archiving shop’s own lists — and now only theirs. Installers who claimed and completed the work keep every one of those jobs in their Work list, dashboard counts, and calendar, on web and in the app.
- Work you did for another shop stays in your history after they archive the project.
- The dashboard’s completed count and the Work list agree again — the count no longer includes jobs the list couldn’t show.
Projects stay open until every vehicle is done
A project only reaches Completed when all of its vehicles are actually finished. Vehicles still in draft, and in-house installs still on the shop floor, now hold the project open.
- Draft vehicles are no longer sealed inside a finished project — they stay editable, schedulable, and removable until you decide.
- Scheduling a draft vehicle on a finished project reopens it, the same as adding a new vehicle does.
- The affected projects were repaired — their draft vehicles are workable again.
The claim list only shows released work
- Bulk routing changes could publish still-draft vehicles to the network claim feed; only released vehicles reach it now.
Fixes and polish
- Platform admin pages no longer render for accounts without admin access.
- The project timeline says why a project reopened — a vehicle was added, or a vehicle was scheduled.