Actual install dates on the calendar
A vehicle sits on the day it was actually started or completed, with the planned day and the difference beside it; one Install record card everywhere; a compact schedule header.
Actual dates win
Once work starts, the calendar shows the vehicle on the day it started; once done, on the day it was completed. The planned day stays and the difference shows as a red or green chip, so forecast and actual read side by side.
- Month cells append the difference (“· +2d”); day lists and sheets show a “+2 days” or “−1 day” chip beside the actual date.
- A vehicle counts as behind only while its planned day has passed with no work started; a late completion keeps the Completed colour.
- The plan itself is never overwritten. Print windows, gates, and reports still read the planned day.
- Started and completed times show as 12-hour clock times.
One Install record
The vehicle sheet, the installer sheet, and the calendar peek show the same Install record card once work starts: planned day and time, flexible range, started, completed, install time, reworks. The separate Completed card is gone.
- The sign-off card is labelled “Sign-off”; in-house approvals do not show one.
- The VIN, or the fleet unit number, leads every vehicle row on the schedule and the job board, so twenty identical trucks are tellable apart.
A compact schedule header
One row: the month, the vehicle count and revenue for the range, an alert icon whose popover lists what needs attention (behind, needs a claim, not posted, unscheduled) and filters the board to it, and a state picker with colours and counts.
- Unscheduled vehicles are the last option in the state picker and show as a list in place of the grid.
- On a phone the header stacks instead of squeezing the summary beside the controls.
Fixes and polish
- A flexible date range that has fully passed says so on the claim sheet instead of offering a date picker with no valid day; the poster updates the dates.
- Dates no longer render one day early in the calendar peek and other date-only labels.
- Editing the spec or price of a released vehicle is allowed until an outside installer claims it; a claim that lands mid-edit is refused rather than overwritten.
- Vehicle rows use a readable meta line.